We've had some delays due to the bad weather and other unforeseen events but we are back on track now and headed for the finish line - woohoo! At this writing we're thinking a couple of weeks before moving in.
Most of the baseboards are in. The bathrooms are almost complete. The tile is in and grouted. We're hoping for a string of dry days so the deck and porch can be installed (decking material).
Kitchen
Great Room
Entry
Fireplace (Gas Log)
Guest Bath
Master Bath
Base Board
Out the back window
Monday, March 28, 2011
Saturday, March 12, 2011
True Colors - Part 4
It's been a little over a week since our last post. Ninety-nine percent of the flooring is in. The tile needs to be grouted and baseboards need to be installed. One patch of hardwood needs to be installed in the entry to the master bathroom. The surround is in for the jetted tub (master bath) and the tub needs to be put in place. The granite back splash is in. The decking will be going in soon.
Entry
Great Room
Kitchen
Master Bathroom
Master Bedroom
Dining Room
Misc
Entry
Great Room
Kitchen
Master Bathroom
Master Bedroom
Dining Room
Misc
Subscribe to:
Posts (Atom)