Saturday, September 25, 2010

Ongoing progress #2

Things are going to start happening quickly now. The water is connected. The sewer/septic system is connected. Seasonal streams have been redirected and lined with "riprap" to stop erosion. We've been busy for weeks now picking our appliances, sinks, toilets, doors, windows, plumbing fixtures, paint colors and everything else you could think of that is in a house. We picked the tile, wood flooring and granite a while back and are coordinating everything with that.

Riprap
View from back of lot.

No comments:

Post a Comment